Estimate payback based on yearly input reduction and per-batch savings.
Flow rate is used only to estimate production time for the selected batch size.
Operator Run time is calculated as per-batch attention time to refill the hopper. Initial setup and post-extraction cleaning adds 10 minutes total.
Note: X100 and X150 are manually hand-cranked, while X250 and X350 can be run autonomously.